Proof · Results
Case Studies
Real dividing wall column projects — the challenge, what we engineered, and the measured results in commercial operation.
~4
mo payback
30↓
% CAPEX
28↓
% Utilities
World’s first: a seven-column train replaced by four DWC Prime columns
Acetone-derivatives complex, India · Commissioned 2026 · 35% less plot space
Read case study →+40%
capacity
$3M
CAPEX
0
new columns
A series of naphtha splitters revamped to a single DWC Prime
Refinery, Mumbai, India · +40% capacity & sharper cuts, within existing columns
Read case study →1st
DDWC in an ISOM unit
4-cut
one DWC column
New
pharma-grade hexane
World’s first Dual DWC deisohexanizer in an isomerization unit
CPCL refinery, Manali, Chennai, India · More throughput at unchanged RON, plus a new high-value hexane product
Read case study →<1 ppm
CS₂ in naphtha
New
premium-gasoline cut
0
new columns
Depentanizer retrofit to DWC Prime cuts CS₂ below 1 ppm
Refinery, Southeast Asia · Meets the new CS₂ spec plus a premium-gasoline stream, within the existing column
Read case study →World’s 1st
commercial Dual DWC
3→1
columns
½
equipment count
World’s first commercial Dual DWC: multiple solvent grades from one column
BPCL Mumbai refinery · A three-column dearomatized-solvent train delivered as one flexible Dual DWC
Read case study →3 cuts
light · med · heavy
Turnkey
feasibility→start-up
0
added reboiler energy
Turnkey naphtha splitter revamped to a Dual DWC
MRPL, Mangalore, India · Three sharper naphtha cuts with no change in reboiler duty, debottlenecking the downstream ISOM & CCR units
Read case study →More case studies coming soon.
